Site Overlay

ATMOS DC32S PDF

Boiler installation. GENERAL CONDITIONS FOR THE PROPER FUNCTION AND HIGH EFFICIENCY OF ATMOS BOILERS. Boiler installation may be provided. Pyrolysis boiler Atmos DC 32 S is designed for burning wood on the principle of generator gasification with the use of sucking fan that removes the boiler Atmos. Instalación de una caldera ATMOS DC32S de gasificación de leña de 32kW en Cuenca con depósito de inercia.

Author: Vizil Yogore
Country: El Salvador
Language: English (Spanish)
Genre: Career
Published (Last): 21 January 2009
Pages: 253
PDF File Size: 9.33 Mb
ePub File Size: 15.11 Mb
ISBN: 590-1-62414-872-4
Downloads: 30374
Price: Free* [*Free Regsitration Required]
Uploader: Tara

Be the first to review this product. Environment Reverse combustion and a ceramic combustion chamber enable perfect combustion with minimum polluting emissions.

Wood gasification boiler Atmos DC 32 S

It is also linked to solar water heating panels but these will be staying and be plumbed in to the new system. They comprise the at,os hopper, which is equipped at the bottom with a heatproof pipe fitting with longitudinal hole for the combustion gases and passage of gases.

  BOLETIN 4060 NORMAS DE AUDITORIA PDF

Not signed in Sign In. Table Of Contents Filling door 15 Cleaning cover 3. Sealing – nozzles 25 V. Filling Of Wood Buy individually or both books together. Heating Dd32s Maintenance – Including Boilers Drawings Of Boilers Basic Wood Burning Data Ash pan door 16 Orifice plate 4. Fireproof and heat-resisting fitting – half-moon 26 Door sealing – cord 18 x 18 System Operation With Accumulating Dc32 The ventilator automatically switches off when the fuel burns out.

Wood gasification boiler Atmos, Model DC 32 S, Heat output 35kW, Electro-Mechanical control, Blower

Flue Gas Ducting Regulating safety valve 22 Power regulator – Honeywell FR 9. DocumentationCommunity Support. Cleaning Of The Boiler Extraction Ventilator Schematics Advantages Of Boilers Preparing Boilers For Operation The Atmos is atmmos running the heating and hot water and is about three years old. Slightlygreen, I am interested in taking your system off your hands.

I’m changing the system because I’m away from home quite a lot so I need something that can be set on a timer to keep the df32s ticking over while I’m away. Additional Information Warranty 2 Years Weight kg Table of contents Purpose Attendance And Inspection Cut Away View – Dc70s A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

  DS1210 DATASHEET PDF

The burnout part of the multiple chamber furnace under the fuel hopper is equipped with ceramic pipe fittings. Ignition And Operation There is a vertical combustion gas duct in the back of the boiler body, which is equipped with a heating valve in the upper section.

Large space for ash when burning wood you have to clean it once per week. Boiler Connection With Equilizing Tank Heatproof Shaped Piece nozzle Replacement Cheeky guess is slightlygreen can’t resist the RHI?? Easy servicing and cleaning. Thermoregulatory Valve Esbe Ceramic Ash Collector